July 22nd, 2007
Just a quick update to let everyone know that we have a host of new products in our store these include:
Stylish Oval Desk Grommets available in Satin Nickel, Matt Chrome and Bright Chrome

Desk Mounted Power and Data Outlets

Brush blanking panels for your Server Cabinet

We also have for a limited time only a SALE on our range of round cable grommets!
We also have a our full range of Floor Tile Lifters / Suction Cup Lifters / Carpet Tile Lifters in stock and ready to ship.
And as always we offer FREE SHIPPING on all orders, so visit the Data Clean Store and start saving time and money!
Technorati Profile
Posted in Data Centre Energy Reduction, Floor Tile Lifter, Cable Grommets, Bypass Airflow, Data Centre Construction Work, metal cable grommets, metail desk grommets, metal desk grommets, metal floor grommets, desk grommets, floor grommets, Data Centre Cabinets | No Comments »
May 21st, 2007
Partitioning off perimeter corridors SAVES ENERGY, which SAVES MONEY!
Creating dedicated “hot and cold aisles” or “rack and row” data center equipment placement configurations with PLENAFORM increases the static pressure delivering a higher volume of cooling through perforated tiles and at a further distance from the CRAC units. The Venturi effect is attained, whereby more air pressure rises in the dedicated cold aisles.
With the deployment of PLENAFORM, a “VUF” vertical under floor partitioning system, air flow distribution may be directed more efficiently from the CRAC units for maximum equipment air cooling or air blocking requirements in a data center raised floor plenum space.
Installing PLENAFORM to direct air flow from the “source of the air” plenum level, a data centre manager can better achieve a thermally tuned data centre. Integrating PLENAFORM into the data centre design helps to mitigate thermally associated risk to equipment hardware.
The key word here is high density computing and PLENAFORM helps to solve thermal imbalances in your data centre environment simply and inexpensively!
Posted in Data Centre Energy Reduction, Green Data Centre Design, Data Centre News, Bypass Airflow, Raised Access Floor, Access Floor, Data Centre Construction Work, Plenaform, Under Floor Air Barrier, Under Floor Fire Barrier | No Comments »
May 21st, 2007
Do you want to lower your Data Centre energy consumption?
Not a problem with PLENAFORM. Decide where you want the air to flow, snap the panels together at the desired height for the under floor space, drop them in, and attach them to the pedestals.
PLENAFORM is a passive and contributory holistic solution that can be easily installed as an effective “VUF” or vertical under floor partitioning system, to direct air flow within the plenum space.
PlenaForm directs the source of the cold air from the CRAC units to where the air is needed most.
PLENAFORM helps to maintain the static pressure further away from a CRAC unit and is a simple solution to cool thermal hot spots in your Data Centre.
Since PLENAFORM is fire-rated they can even be used to make vertical blanking panels between racks or on the sides of open server racks to keep hot air from wrapping around and mixing with the intake air.
Partitioning off perimeter corridors SAVES ENERGY, which SAVES MONEY!

A flexible, snap together, air flow baffle system which helps to solve dynamic thermal imbalances in data centres.
PLENAFORM is scored both vertically and horizontally so sections can be removed or added onto to meet any height or width requirement. All angles of bend radius may be attained, including inside and outside mounting to raised floor pedestals.
Continuous punch out hole pattern allows attachment to any style raised floor pedestal at any height or width location with cable ties.
PLENAFORM is formed from a flame retardant polypropylene compound that is inert, non-conductive, and non-hygroscopic.
Easy to Install - Right Out of the Box!
· Control and Balance Data Center Airflow
· Separate Hot Aisles from Cold Aisles
· No Installation Tools Required
· On-Site Configurable (Width and Height)
· Fits ANY Raised Floor Pedestal
· Reduces Energy Consumption and Operating Costs
· An Inert, Non-Conductive and Non-Hygroscopic Material
· Flammability rating of UL V- 0 per UL94
· RoHS and WEEE Compliant
· An Energy Saving and Thermal Tuning Tool
PLENAFORM has many uses:
- Seal off below tape auto loaders to stop tape reader condensation.
- Seal off under PDU’s.
- Works above the floor to stop lateral heat transfers in server racks.
- Create dedicated return air paths above ceilings.
- Create CRAC extension intake heads.
Posted in Data Centre Energy Reduction, Data Centre News, Bypass Airflow, Raised Access Floor, Access Floor, Data Centre Construction Work, Plenaform, Under Floor Air Barrier, Under Floor Fire Barrier | No Comments »
May 20th, 2007
So you have to do some construction work in your Data Centre?
How do you control and manage the dust that will be created in the Data Centre?
You insist that your contractor uses the ZipWall Dust Barrier System during the construction work.
The ZipWall Dust Barrier System is an easy to construct modular dust barrier system that can contain the dust, to allow for a controlled clean-up after the construction work has been completed.
Guide to ZipWall Dust Barrier System.pdf
Purchase the ZipWall Dust Barrier System
Posted in Data Centre Cleaning, Clean Server Room Environment, ZipWall, Dust Barrier System, Data Centre Construction Work | No Comments »